I am now accessing as a :

Government Of Assam Biswanath District

Ongoing Schemes

Following schemes are carried on by the Biswanath Chariali Division(Irrigation), in Biswanath District during  financial Year 2017-18,2018-19, 2019-20 under different programme . These are:-

  1. Solar Powered MDTW I/S  Baghmora Blok(6 Points), Behali Block Behali Block (4 Points), Gohpur area(2 Points) under SOPD for the year 2017-18.
  2. DTW I/S with solar power at Behali Dev. Block (5 Pts), Baghmara Dev. Block(5 Pts), Dakhin Kalabari (1 Pts)  under RIDF-XXIV(NABARD) for the year 2018-19.
  3. Jatia Krishi Bandh under RIDF-XXIV(NABARD) for the year 2018-19
  4. Bharalijuli FIS under RIDF-XXIV(NABARD) for the year 2018-19.
  5. Solar Powered MDTW Schemes Under SOPD for the year 2018-19 in Biswanath District(67 Points).
  6. Installation of Tubewell Schemes Under  PMKSY-HKKP Access to Ground Water in Biswanath District(369 Pts).